The full LUMI system architecture has been revealed.
You can visit the LUMI website for more information:
https://www.lumi-supercomputer.eu/lumis-full-system-architecture-revealed/
Here, you can also read that the schedule for the second phase installations has unfortunately been delayed. The timeline for the second deployment phase now looks like this:
- mid-February 2022: install 6 cabinets (140 Pflop/s)
- early March 2022: start of the second pilot use phase
- mid-April 2022: install the rest of the LUMI-G
- mid-May 2022: general availability