The full LUMI system architecture has been revealed.

You can visit the LUMI website for more information:

https://www.lumi-supercomputer.eu/lumis-full-system-architecture-revealed/

Here, you can also read that the schedule for the second phase installations has unfortunately been delayed. The timeline for the second deployment phase now looks like this:

  • mid-February 2022: install 6 cabinets (140 Pflop/s)
  • early March 2022: start of the second pilot use phase
  • mid-April 2022: install the rest of the LUMI-G
  • mid-May 2022: general availability
Categories: